Udemy - Electrical On Site Installations
- 收录时间:2023-09-14 03:19:27
- 文件大小:2GB
- 下载次数:1
- 最近下载:2023-09-14 03:19:27
- 磁力链接:
-
文件列表
- 1. First Fix Installation/9. Installation of Floor Conduits (Installation Steps) - Part 2.mp4 131MB
- 5. Third Fix Installation/3. Third Fix Ceiling Installations (Light Fixtures) - Part 3.mp4 121MB
- 3. Panels, DB Installation & Wire Termination/3. Distribution Board Installation (Installation Procedures) - Part 3.mp4 119MB
- 1. First Fix Installation/18. Cable Tray & Trunking Installation (Trunking Installation) - Part 4.mp4 114MB
- 1. First Fix Installation/2. Installation of Conduits & Back Boxes in Concrete Slab (Installation Steps).mp4 108MB
- 5. Third Fix Installation/2. Third Fix Wall Installations (Sockets & Switches).mp4 108MB
- 2. Second Fix Installation/1. Wire Pulling Inside a Conduit - Conduit Fill Ratio.mp4 106MB
- 2. Second Fix Installation/2. Wire Pulling (Installation Procedures).mp4 99MB
- 3. Panels, DB Installation & Wire Termination/1. Distribution Board Installation - Part 1.mp4 95MB
- 1. First Fix Installation/14. Installation of Flexible Conduits.mp4 86MB
- 1. First Fix Installation/6. First Fix - Installation of Conduits & Back Boxes (Installation Steps) - Part 3.mp4 83MB
- 1. First Fix Installation/16. Cable Tray & Trunking Installation (Cable Tray Installation) - Part 2.mp4 80MB
- 3. Panels, DB Installation & Wire Termination/11. Capacitor Banks (Installation of Reactors & Capacitors) - Part 4.mp4 79MB
- 4. Testing Stage/3. Megger (Insulation) Test Practical Site Videos.mp4 77MB
- 1. First Fix Installation/3. Installation of Conduits & Back Boxes in Concrete Slab (Details & Check Items).mp4 73MB
- 5. Third Fix Installation/1. Introduction to Third Fix Installations.mp4 68MB
- 1. First Fix Installation/1. Installation of Conduits & Back Boxes in Concrete Slab - Part 1.mp4 66MB
- 4. Testing Stage/1. Megger (Insulation) Test - Part 1.mp4 61MB
- 1. First Fix Installation/12. Installation of Metallic G.I Conduits (Installation Steps) - Part 2.mp4 61MB
- 3. Panels, DB Installation & Wire Termination/6. Distribution Board Termination & Dressing Procedures - Part 2.mp4 60MB
- 1. First Fix Installation/4. Installation of Conduits & Back Boxes - Part 1.mp4 57MB
- 3. Panels, DB Installation & Wire Termination/8. Capacitor Banks - Part 1.mp4 47MB
- 1. First Fix Installation/8. Installation of Floor Conduits (Introduction & Installations) - Part 1.mp4 46MB
- 3. Panels, DB Installation & Wire Termination/5. Distribution Board Termination & Dressing - Part 1.mp4 42MB
- 1. First Fix Installation/15. Cable Tray & Trunking Installation (Tray Introduction) - Part 1.mp4 40MB
- 4. Testing Stage/2. Megger (Insulation) Test - part 2.mp4 40MB
- 3. Panels, DB Installation & Wire Termination/7. Distribution Board Termination & Dressing (Main Check Items) - Part 3.mp4 39MB
- 3. Panels, DB Installation & Wire Termination/10. Capacitor Banks (Harmonics) - Part 3.mp4 30MB
- 2. Second Fix Installation/3. Wire Pulling (Main Check Items).mp4 28MB
- 1. First Fix Installation/10. Installation of Floor Conduits (Main Check Items) - Part 3.mp4 27MB
- 3. Panels, DB Installation & Wire Termination/4. Distribution Board Installation (Main Check Items) - Part 4.mp4 25MB
- 1. First Fix Installation/11. Installation of Metallic G.I Conduits (Installation Details) - Part 1.mp4 24MB
- 3. Panels, DB Installation & Wire Termination/9. Capacitor Banks (Mechanism of Work) - Part 2.mp4 24MB
- 1. First Fix Installation/7. First Fix - Installation of Conduits & Back Boxes (Main Check Items) - Part 4.mp4 23MB
- 1. First Fix Installation/13. Installation of Metallic G.I Conduits (Main Check Items) - Part 3.mp4 23MB
- 1. First Fix Installation/17. Cable Tray & Trunking installation (Trunking Introduction) - Part 3.mp4 22MB
- 1. First Fix Installation/5. Installation of Conduits & Back Boxes (Installation Details) - Part 2.mp4 18MB
- 3. Panels, DB Installation & Wire Termination/2. Distribution Board Installation (Installation Details) - Part 2.mp4 15MB
- 3. Panels, DB Installation & Wire Termination/7.1 Method Statement for Termination & Glanding.pdf 1002KB
- 3. Panels, DB Installation & Wire Termination/2.1 Guide to DB Installations.pdf 707KB
- 4. Testing Stage/3.1 Continuity and Insulation Test Requirements.pdf 645KB
- 1. First Fix Installation/14.1 Flexible-Steel-Conduit British Standards.pdf 420KB
- 1. First Fix Installation/2.1 Non Metallic Conduit British Standards.pdf 373KB
- 3. Panels, DB Installation & Wire Termination/11.1 Installation of Capacitor Banks.pdf 303KB
- 1. First Fix Installation/18.2 Pulling Wires in Trunking Procedures.pdf 273KB
- 2. Second Fix Installation/3.2 Pulling Wires in PVC & GI Conduit Procedures.pdf 246KB
- 2. Second Fix Installation/3.1 Installation of Wires and Cables & Testing.pdf 101KB
- 1. First Fix Installation/18.1 Installation of Cable Tray & Trunking.pdf 49KB
- 5. Third Fix Installation/3.1 Installation of Light Fittings.pdf 35KB
- 5. Third Fix Installation/2.1 Installation of Switches & Sockets.pdf 29KB
- 5. Third Fix Installation/3. Third Fix Ceiling Installations (Light Fixtures) - Part 3.srt 13KB
- 2. Second Fix Installation/1. Wire Pulling Inside a Conduit - Conduit Fill Ratio.srt 11KB
- 1. First Fix Installation/18. Cable Tray & Trunking Installation (Trunking Installation) - Part 4.srt 10KB
- 5. Third Fix Installation/2. Third Fix Wall Installations (Sockets & Switches).srt 9KB
- 1. First Fix Installation/9. Installation of Floor Conduits (Installation Steps) - Part 2.srt 9KB
- 3. Panels, DB Installation & Wire Termination/1. Distribution Board Installation - Part 1.srt 9KB
- 1. First Fix Installation/14. Installation of Flexible Conduits.srt 9KB
- 3. Panels, DB Installation & Wire Termination/3. Distribution Board Installation (Installation Procedures) - Part 3.srt 9KB
- 2. Second Fix Installation/2. Wire Pulling (Installation Procedures).srt 8KB
- 1. First Fix Installation/2. Installation of Conduits & Back Boxes in Concrete Slab (Installation Steps).srt 8KB
- 5. Third Fix Installation/1. Introduction to Third Fix Installations.srt 7KB
- 4. Testing Stage/1. Megger (Insulation) Test - Part 1.srt 7KB
- 1. First Fix Installation/16. Cable Tray & Trunking Installation (Cable Tray Installation) - Part 2.srt 7KB
- 1. First Fix Installation/6. First Fix - Installation of Conduits & Back Boxes (Installation Steps) - Part 3.srt 6KB
- 1. First Fix Installation/3. Installation of Conduits & Back Boxes in Concrete Slab (Details & Check Items).srt 6KB
- 3. Panels, DB Installation & Wire Termination/11. Capacitor Banks (Installation of Reactors & Capacitors) - Part 4.srt 6KB
- 3. Panels, DB Installation & Wire Termination/8. Capacitor Banks - Part 1.srt 5KB
- 1. First Fix Installation/4. Installation of Conduits & Back Boxes - Part 1.srt 5KB
- 1. First Fix Installation/12. Installation of Metallic G.I Conduits (Installation Steps) - Part 2.srt 5KB
- 1. First Fix Installation/1. Installation of Conduits & Back Boxes in Concrete Slab - Part 1.srt 5KB
- 1. First Fix Installation/8. Installation of Floor Conduits (Introduction & Installations) - Part 1.srt 5KB
- 1. First Fix Installation/15. Cable Tray & Trunking Installation (Tray Introduction) - Part 1.srt 5KB
- 3. Panels, DB Installation & Wire Termination/6. Distribution Board Termination & Dressing Procedures - Part 2.srt 4KB
- 3. Panels, DB Installation & Wire Termination/5. Distribution Board Termination & Dressing - Part 1.srt 4KB
- 4. Testing Stage/2. Megger (Insulation) Test - part 2.srt 4KB
- 4. Testing Stage/3. Megger (Insulation) Test Practical Site Videos.srt 4KB
- 3. Panels, DB Installation & Wire Termination/7. Distribution Board Termination & Dressing (Main Check Items) - Part 3.srt 3KB
- 3. Panels, DB Installation & Wire Termination/10. Capacitor Banks (Harmonics) - Part 3.srt 3KB
- 3. Panels, DB Installation & Wire Termination/4. Distribution Board Installation (Main Check Items) - Part 4.srt 3KB
- 1. First Fix Installation/11. Installation of Metallic G.I Conduits (Installation Details) - Part 1.srt 3KB
- 2. Second Fix Installation/3. Wire Pulling (Main Check Items).srt 3KB
- 1. First Fix Installation/17. Cable Tray & Trunking installation (Trunking Introduction) - Part 3.srt 3KB
- 3. Panels, DB Installation & Wire Termination/9. Capacitor Banks (Mechanism of Work) - Part 2.srt 2KB
- 1. First Fix Installation/10. Installation of Floor Conduits (Main Check Items) - Part 3.srt 2KB
- 1. First Fix Installation/7. First Fix - Installation of Conduits & Back Boxes (Main Check Items) - Part 4.srt 2KB
- 1. First Fix Installation/13. Installation of Metallic G.I Conduits (Main Check Items) - Part 3.srt 2KB
- 1. First Fix Installation/5. Installation of Conduits & Back Boxes (Installation Details) - Part 2.srt 1KB
- 3. Panels, DB Installation & Wire Termination/2. Distribution Board Installation (Installation Details) - Part 2.srt 1KB
- Readme.txt 119B